Additional information
Weight | 4 lbs |
---|---|
Condition |
$16.00
This is a nice, long lead or lunge line. Very much in a clinician style. 11′ long, 3/4″ diameter in black/white/red poly yacht rope style with a heavy duty stainless bull snap. Great long lead, training lead, or lunge line. Truly a versatile piece of training tack. In very good used condition, is marked with a brand on the popper, however the leather on the popper shows a bit of use and is a bit dry, so we cannot make out the brand.
1 in stock
Weight | 4 lbs |
---|---|
Condition |