Additional information
| Weight | 4 lbs |
|---|---|
| Condition | |
| Color | |
| MPN | Does Not Apply |
$24.00
This is a nice, long lead or lunge line. Very much in a clinician style. 12′ long, 3/8″ diameter royal blue, with black leather popper at the end. Offers a loop through end, which can easily be attached to a halter or have a snap added. Great long lead, training lead, or lunge line. Truly a versatile piece of training tack. This lead is very soft and has a really nice feel in your hands. Never used, only stored. Calling it in ‘demo’ condition as it has a very small snag from storage.
1 in stock